If space is available, it may be sensible to extend the base for a future hut/shed/temporary building that could be e used as a wood store.
Put your DX / air compressor outside.If space is available, it may be sensible to extend the base for a future hut/shed/temporary building that could be e used as a wood store.
It's being pumped Dave, I've read about different grades and now have no idea which I should useDomP, You can power float and screed either but do not use a vibrating poker. I hired a power screed that reached across the 4.8 m so I could reference off the top of the shuttering (scaffold boards) - this allowed me to obtain a flat concrete surface to within +/_ 3mm. How is the concrete being delivered - pump or barrow?
Enter your email address to join: