DBT85
Established Member
Since I'm going to need a lot of 200mm for my formwork, someone tell me I can cut those down and use them elsewhere in the build if I just treat the cuts? I mean one 6m 200x50 will make 6 studs! I think I could get at least 20 studs out of my formwork, or 6 rafters. Alternatively I could have even more OTT rafters and just use 200mm rather than the 145 specced.
I'd rather that then try to rip 50mm off of a 6m long board and use them as rafters or ties, though that's doable with the circ saw i suppose. Not even going to think about doing it on an evolution table saw!
Davies Timber are going to go through my list and give me a price which is good as the price for it all at the moment on their site is £2555. Thats all the framing, OSB and featheredge, with extra ordered of everything in case of bent, split, or woops. I can always use the extra.
I'd rather that then try to rip 50mm off of a 6m long board and use them as rafters or ties, though that's doable with the circ saw i suppose. Not even going to think about doing it on an evolution table saw!
Davies Timber are going to go through my list and give me a price which is good as the price for it all at the moment on their site is £2555. Thats all the framing, OSB and featheredge, with extra ordered of everything in case of bent, split, or woops. I can always use the extra.