I'm going to be attaching some metalwork to my woodwork using studding epoxied in (to end-grain). Thing is, does anyone know what sort of clearance I should allow between the studding and its hole in the timber for the epoxy?
Nick W":1wyuhhks said:I'm going to be attaching some metalwork to my woodwork using studding epoxied in (to end-grain). Thing is, does anyone know what sort of clearance I should allow between the studding and its hole in the timber for the epoxy?
I used 6mm studding and a 9mm drill.
johnelliott":nkxgcadz said:use the Araldite slow setting stuff, it's stronger.
Enter your email address to join: