A new day, and it’s raining, good excuse not to work in the garden. So I was excused duty and allowed to play.
The overnight rain was hard and it has been on constant for several hours, perfect to test the integrity of the roof. I took a torch into the loft space, and whilst I wasn’t anticipating any problems, was none the less relieved that everything was perfect inside. The guttering was working , so I’d managed to get that in the correct place first time. All this is very new to me, so It’s a pleasant surprise it all works as planned.
I spent the morning finishing the workshop ceiling. Laying the poly across the joists, undoing the last row of screws from the finished boards to overlap it underneath. I needed 4.5 sheets to finish the ceiling, and 4.5 sheets left, no room for error breaking a sheet. All went to plan, the wall rest and deadman doing their bit. I’ll insulate the last few rafters tomorrow, as I wanted to crack on with the walls.
I started garden side, working straight across the end and cutting the door opening after fixing boards to the wall. The long wall was next, six boards all lined up straight to the studs, no problems although humping these fireline boards around is much harder than standard board. Back wall, as the door lining was in, had to be measured, cut and installed across the room, but everything lined up fine. On to the house side, the heavy acoustic boards, first half was fine to the join of the two wall panels I’d made. The second half I’d mis-measured when making the wall up and was half a stud off for the next two boards, leaving the board jut reaching the stud. This wall was effectively still open, Covered just in membrane, there was no OSB so I had access to the stud work. I added a piece of 2x1 to the side of the two studs to carry the board edge. There were several other studs up through the board to fix to as well, but somehow I’d messed this edge calculation up. All resolved with the extra added timber though.
Just the dirty room walls to board out now, probably Monday as I’m restricted to a half day on Sundays and want to finish the insulation first.
All in all a decent day’s work, starting to look a tidy space.