Following a ‘random’ pub group discussion the other day its left me wondering about how long should a ’one-man band’/single tradesman guarantee their work?
I’m not talking about large/medium or even small building constructions (ie extensions etc) but jobs like small garden walls, fencing, patio slabs etc
For instance, a single slab becoming loose, or pointing falling out etc……what if the owner is jet washing or holds regular parties (ie heavy foot traffic).
In my time I always worked within written contract conditions and so understand the formal areas of retentions, practical completions, full completions etc but what do the guys who simply ‘odd-job’ for a living do? After what period do they say something like “hold on, I finished this over a year ago etc etc”
How long should these individuals honour their work? I’d be really interested to hear what your opinions are.
Thanks.
Following a ‘random’ pub group discussion the other day its left me wondering about how long should a ’one-man band’/single tradesman guarantee their work?
I’m not talking about large/medium or even small building constructions (ie extensions etc) but jobs like small garden walls, fencing, patio slabs etc
For instance, a single slab becoming loose, or pointing falling out etc……what if the owner is jet washing or holds regular parties (ie heavy foot traffic).
In my time I always worked within written contract conditions and so understand the formal areas of retentions, practical completions, full completions etc but what do the guys who simply ‘odd-job’ for a living do? After what period do they say something like “hold on, I finished this over a year ago etc etc”
How long should these individuals honour their work? I’d be really interested to hear what your opinions are.
Thanks.