another flight of stairs

UKworkshop.co.uk

Help Support UKworkshop.co.uk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Absolutely fantastic !!!! Smartest flight I've seen in a long time !!

Sent from my SM-G960F using Tapatalk
 
I have just looked back in an older edition of Part K of building regs and it clearly states in writing the going at the narrow end of tapered tread should be minimum 50 mm but shows the diagram saying 50 mm tread #-o. In the latest edition the only reference I can see to it is on the diagram people have already posted showing minimum tread width 50 mm.

I guess it has been amended for obvious reasons, I would interpret it as 50 mm tread width now as that is what it says and going is not mentioned.
 
Oh right - I hadn't missed that, thought there might be something elsewhere. Given those words are setting aside and replacing the standard going requirements, I think that is clearly intended as a statement that the requirements for tapered treads are those on the diagram (going on centre line, tread on inside). I don't think the two together can sensibly be interpreted any other way. But, it's not a law.

If your local BO disagrees, wind him by saying it's just guidance and not binding anyway. (Maybe not).

Edit: Also 1.27 makes no sense unless 1.25 is saying there is no going requirement on the inside, just a tread requirement. Otherwise, your inside 50mm going in fact has to be as wide as your going on the straight treads, and that way lies madness. In 1.27 therefore, the going requirement for the tapered treads has to mean a single (centre line) going requirement. The reference to a going requirement cannot be different as between 1.25 and 1.27 (or it would have to stipulate in 1.27 just the centre line going to exclude any separate inner going requirement). Accordingly, the inside tread requirement in diagram 1.9 has to be separate from the single centre line going requirement for a tapered tread.
 
That goes beyond skill. I just love the photos and the way it progressed. Brilliant!
 
Have been wanting to post these for a while now, images of the completed flight

0GMlmwC.jpg


pIP987s.jpg


8VbrqSe.jpg


dFTQPdT.jpg


804C0bs.jpg


zBJH5jB.jpg


q3No9Ld.jpg


AJoyR8G.jpg


PHIWvqj.jpg


Q3tcNRm.jpg


OaKWP0f.jpg


tuql44t.jpg


QgSqPjS.jpg


TYTTLxn.jpg


wHGvYM8.jpg


ttH4Hu6.jpg
 
Beautiful work, love the panelled newel post.

Mind letting me know what finish you used?

Would it be uncouth of me to ask you what you charged for the whole process? Id never have the luxury of the time Id need to dedicate to this unfortunately. In our last wave of proposed architect drawings our new landing is very similar, if not identical, but includes a 3 step drop between floors. (PM is fine or tell me to bugger off)
 
Back
Top