I notice from other posts there is electrical knowledge here,my proposal is to mount a shower isolating switch in the centre of my small shop this supplys each m/c that requires extraction and the extractor (which is modified to remove the no volt cut out and is external to the shop) .
So pull the switch extractor runs ,switch on and use the m/c pull the switch when finished (no need to switch of m/c ) saves going out side to switch the extractor . Any body see any problems with this .
So pull the switch extractor runs ,switch on and use the m/c pull the switch when finished (no need to switch of m/c ) saves going out side to switch the extractor . Any body see any problems with this .