New workshop build

UKworkshop.co.uk

Help Support UKworkshop.co.uk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
If the rafters are all same length it looks like the long wall tops have spread realign then pilot drill the ridge board and screw into the center line of the correctly positioned say right hand rafter then in the next bay into the left hand and so on then screw at a angle there opposite numbers this will give a straight ridge and strong connection . Fix a collar at the height you want at the first and last A frame then set up strings to fit the rest to keep it all straight and level.
 
well dave, i think you have up to now done a great job,, well done kiddo.
the points that have been raised are good ones, they are not slagging you off, its just constructive critisism ( excuse the pun :D )
the trusses should have been made with a birds mouth joint at the top of the walls. but hey its you workshop and thats all that matters.
 

Latest posts

Back
Top