Moving to the new house in a couple of weeks and I will need 3 phase supply as I am using an electric boiler and it is 26kW
Contacted UK Power networks and they came out and surveyed in 2 working days and gave me a price on the spot. It took another nine working days for the official quote and I then contacted eON for some days they had available to install a new meter. They gave me three possible days in a couple of weeks time. Went back to UK networks and they said the first day was available for them to install the supply. Returned to eON and said right lets go with this day - after waiting 20min to talk to somebody. 40min later I find that although the date previously quoted is available I can't have it as I need to give 30 day's notice. Was accidentally cut off and the operator called me back and after another 20 min and still no movement on the 30 days notice. The operator said they would see what they can do as we will be without hot water for at least 23 days. Had an email back saying they still couldn't move on the date and my boiler would run on single phase without knowing any details about it.
Very pineappled off and tried calling the boiler supplier but it was 16:00 by then and they had gone home early. Also tried to contact another electricity supplier but they had closed at 16:00 on a Friday and their quoted time to reply to emails was nearly 2 working days
I remember when we built a house years ago and I only had to deal with the electricity board. I needed a temporary supply and within two weeks I had a new pole, supply and meter installed.
Looks like I will have to put an electric bar heater under the bath to heat up the water
Contacted UK Power networks and they came out and surveyed in 2 working days and gave me a price on the spot. It took another nine working days for the official quote and I then contacted eON for some days they had available to install a new meter. They gave me three possible days in a couple of weeks time. Went back to UK networks and they said the first day was available for them to install the supply. Returned to eON and said right lets go with this day - after waiting 20min to talk to somebody. 40min later I find that although the date previously quoted is available I can't have it as I need to give 30 day's notice. Was accidentally cut off and the operator called me back and after another 20 min and still no movement on the 30 days notice. The operator said they would see what they can do as we will be without hot water for at least 23 days. Had an email back saying they still couldn't move on the date and my boiler would run on single phase without knowing any details about it.
Very pineappled off and tried calling the boiler supplier but it was 16:00 by then and they had gone home early. Also tried to contact another electricity supplier but they had closed at 16:00 on a Friday and their quoted time to reply to emails was nearly 2 working days
I remember when we built a house years ago and I only had to deal with the electricity board. I needed a temporary supply and within two weeks I had a new pole, supply and meter installed.
Looks like I will have to put an electric bar heater under the bath to heat up the water