Replacing the roof on an outhouse. Pulled the old one off and plan to put a wall plate on the top of the brickwork to build from.
I plan to drill holes and use a chemical anchor and threaded bar to hold in place.
There is a gap under the timber as the top of the brickwork is not flush. I was thinking of a layer of DPM under the timber, but do I then bed it in some mortar or something else?
Fitz.
I plan to drill holes and use a chemical anchor and threaded bar to hold in place.
There is a gap under the timber as the top of the brickwork is not flush. I was thinking of a layer of DPM under the timber, but do I then bed it in some mortar or something else?
Fitz.