Does anyone have even an idea what one could expect to pay for a 3 phase connection?
Assuming that the trenchwork was already done, ducting laid and all YEDL (or whoever) would have to do is joint it in the path outside, supply around 20m of cable (or I could if relevant) and the cutout.
3 Phase runs right past the drive entrance and as work progresses, I would hate to finish the garage\workshop and lay a new drive only to find out that a 3 phase connection was relatively cheap.
Assuming that the trenchwork was already done, ducting laid and all YEDL (or whoever) would have to do is joint it in the path outside, supply around 20m of cable (or I could if relevant) and the cutout.
3 Phase runs right past the drive entrance and as work progresses, I would hate to finish the garage\workshop and lay a new drive only to find out that a 3 phase connection was relatively cheap.