the_g_ster
Established Member
Morning all, not posted for a while, but have a curious one.
I am doing an extension in a 1937 born house. Got a local joinery shop, that does some fancy shop fitting and more basic stuff to copy the existing skirting.
12m of it is about 220 quid, they phoned me monday to say that I absolutely must pick it up on tuesday when it's ready and could I pay now over the phone. I said no, I wanna see it first, and make sure it's all straight and not bowed. They said ahhh, that's an issue, you need to pick it up straight away else it will bow....
Work got in the way so only able to get a car with roof bars and get down to collect thursday. They are less than happy with me and quite aggressive on the phone. The joinery manager is going to phone me back as I have said that I don't want to be paying for something that looks great when it leaves their shop, but in a few days when I stick it to the wall it looks like a banana!
Thoughts?
I am doing an extension in a 1937 born house. Got a local joinery shop, that does some fancy shop fitting and more basic stuff to copy the existing skirting.
12m of it is about 220 quid, they phoned me monday to say that I absolutely must pick it up on tuesday when it's ready and could I pay now over the phone. I said no, I wanna see it first, and make sure it's all straight and not bowed. They said ahhh, that's an issue, you need to pick it up straight away else it will bow....
Work got in the way so only able to get a car with roof bars and get down to collect thursday. They are less than happy with me and quite aggressive on the phone. The joinery manager is going to phone me back as I have said that I don't want to be paying for something that looks great when it leaves their shop, but in a few days when I stick it to the wall it looks like a banana!
Thoughts?