This may sound a silly question but worth a go.
I'm going to hopefully start my workshop build in the next week or two but can't afford to lay out all the materials in one hit. Anyway I've got 3/4 of studs etc and timber to build the base but things like OSB & Cladding will have to wait.
Is this a project that can be done is stages? So in other words can I build the timber base and maybe cover it with tarpaulin. All timbers including studs have been treated too.
Thanks.