This is going to take a while.
I have dimensioned the timbers roughly and only have a few scraps left so if this goes wrong there will be loads of firewood
I cant get more timbers to match so cut once policy...fingers crossed
fairly standard design...sort of
the front will have 4 doors 2 x bifold
the back will have a split fold down flap...the client (my son) couldn't make his mind up
all fittings will be brass
first job was to laminate 5 pieces together to make "hand rails" \ top of sled ends
I tried to turn these but the lathe threw them back at me
I know why , but plan B was to hand plane them....took a while
the grain is a little problematic in places
a few pics below
excuse the makeshift workbench
bits of mdf for template and spacing
Steve
I have dimensioned the timbers roughly and only have a few scraps left so if this goes wrong there will be loads of firewood
I cant get more timbers to match so cut once policy...fingers crossed
fairly standard design...sort of
the front will have 4 doors 2 x bifold
the back will have a split fold down flap...the client (my son) couldn't make his mind up
all fittings will be brass
first job was to laminate 5 pieces together to make "hand rails" \ top of sled ends
I tried to turn these but the lathe threw them back at me
I know why , but plan B was to hand plane them....took a while
the grain is a little problematic in places
a few pics below
excuse the makeshift workbench
bits of mdf for template and spacing
Steve