Molynoox
Established Member
Hi All,
I am making progress with my garden room build, groundscrews have been installed and I have now started digging the trench.
The below is my current trench 'design' if you can call it that - there doesn't seem to be any clear answers on the topic of combining all 4 types of service in one trench
I have kept to 100mm spacing between the services
I may use conduits for all or some, not sure on that - maybe electricity and comms in one conduit?
I have placed water as far away from waste as I can, to avoid contamination in case of a leak, but not sure if this is really going to help or is necessary (I did read somewhere that this was advisable, but I am not sure how the waste could enter the water pipe, but anyway)
your thoughts on this?
thanks
Martin
I am making progress with my garden room build, groundscrews have been installed and I have now started digging the trench.
The below is my current trench 'design' if you can call it that - there doesn't seem to be any clear answers on the topic of combining all 4 types of service in one trench
I have kept to 100mm spacing between the services
I may use conduits for all or some, not sure on that - maybe electricity and comms in one conduit?
I have placed water as far away from waste as I can, to avoid contamination in case of a leak, but not sure if this is really going to help or is necessary (I did read somewhere that this was advisable, but I am not sure how the waste could enter the water pipe, but anyway)
your thoughts on this?
thanks
Martin