My daughter is having some work done on her house. Her bathroom is being replaced and I said I’d replace her kitchen for her.
I went to her house today to chop in a couple of additional sockets/fused spurs for an extractor fan and dishwasher that will be installed in the new kitchen. The plasterer who is doing the bathroom is going to skim the kitchen for us so I needed to get first fix done.
I turned up and looked at where the new feed for the dishwasher needed to go to discover the double socket she already has on the wall is going to be behind the fridge freezer. Ok so I’ll need to move that over too. That’s when I found out the hot and cold water pipes run right down the middle of the only clear bit of wall in the required area. So instead of electrician mode I had to switch to plumber. Of course I didn’t bring my plumbing stuff…. Screw fix did quite well from me today. As I was moving the pipes I went ahead and did all the plumbing for the new kitchen as well as adding an outside tap.
I did manage to chop in one new pattress but that dislodged a great chunk of the very friable plaster. Ah well I’ll have to go back again tomorrow and do the rest of the electrics and decide if I patch the plaster before the plasterer comes.
What I though was going to be a half day has been a full day and I’ve not really made any progress on what I was supposed to be doing. Good job it’s a long weekend.
I went to her house today to chop in a couple of additional sockets/fused spurs for an extractor fan and dishwasher that will be installed in the new kitchen. The plasterer who is doing the bathroom is going to skim the kitchen for us so I needed to get first fix done.
I turned up and looked at where the new feed for the dishwasher needed to go to discover the double socket she already has on the wall is going to be behind the fridge freezer. Ok so I’ll need to move that over too. That’s when I found out the hot and cold water pipes run right down the middle of the only clear bit of wall in the required area. So instead of electrician mode I had to switch to plumber. Of course I didn’t bring my plumbing stuff…. Screw fix did quite well from me today. As I was moving the pipes I went ahead and did all the plumbing for the new kitchen as well as adding an outside tap.
I did manage to chop in one new pattress but that dislodged a great chunk of the very friable plaster. Ah well I’ll have to go back again tomorrow and do the rest of the electrics and decide if I patch the plaster before the plasterer comes.
What I though was going to be a half day has been a full day and I’ve not really made any progress on what I was supposed to be doing. Good job it’s a long weekend.