CaptainCaveman
Established Member
pdtnc":2z4avvqk said:Nice going, how long til the finished article?
No idea, I need to get it sheeted up at least as soon as possible and get some rubbish out of the house,
I'm guessing I'll manage side frames and some plastic sheeting this weekend, at least then it'll be mostly dry, should also do the initial coat of preservative while the weather is dry and the frame exposed.
I've got a week off work at the end of this month which is when I'm building my kitchen,
I'll see if I can sneak some time in for putting some t&g on the roof and walls externally.
Anyway, here's some mwoor:
Got quite efficient after yesterday so this side took little more than an hour,
just got to work out the front and back boards, got to make something like firrings to support the ends of the t&g roof and then I can sheet.
On reflection I could have moved the back crossbeam further forward and made.life a little easier but it just means some more cutting this way.