Den_Kompaniets":1usl9o2f said:to MikeG. : Unfortunately I didn't take pictures of screwing in the piles, but it's nothing fancy - on the top of each pile there is a through hole, in which two guys insert a long pipe (they use it as a lever) , and walk around the pile, as it sinks into the ground. They use a magnetic level to keep it plumb. After the piles are on the desired depth, or when they can't be driven any further, because of soil conditions, the workers level all the piles with a laser level, and cut them off. Then they weld caps on according to the project. Also sometimes they use machines to drive the piles in.......
Enter your email address to join: