big soft moose
Established Member
- Joined
- 22 May 2008
- Messages
- 5,079
- Reaction score
- 0
The good news is that we are getting wired in 3 phase in our new work workshop (the move is only 6 weeks away now and I am like a kid waiting for santa)
but a couple of questions occur that i figured someone would know the answer to
a) in "harminisation with the EU standard" the 3 phase supply is apparently going to be 400v - will that matter if we want to use old 415V machines like wadkin etc ?
and
b) we are apparently only getting two 3 phase sockets "for reasons of cost" - I know :roll: but i'm not in charge of the relocation project - so question two can you get adaptors for 3ph like you can for normal sockets or are we doomed to continually swaping leads over if we get more than 2 3ph machines (at the moment we dont have any, all ours are single ph, but this is future proofing)
c) and assuming I did want to extend the 3ph later to put more sockets in at the cost to our project (rather than the workshop move budget) can a normal sparky do that or do you need a specialist ? and what sort of cost are we looking at (this is just wire in conduits on blockwork so no plastering or making good involved.
cheers in advance
P
but a couple of questions occur that i figured someone would know the answer to
a) in "harminisation with the EU standard" the 3 phase supply is apparently going to be 400v - will that matter if we want to use old 415V machines like wadkin etc ?
and
b) we are apparently only getting two 3 phase sockets "for reasons of cost" - I know :roll: but i'm not in charge of the relocation project - so question two can you get adaptors for 3ph like you can for normal sockets or are we doomed to continually swaping leads over if we get more than 2 3ph machines (at the moment we dont have any, all ours are single ph, but this is future proofing)
c) and assuming I did want to extend the 3ph later to put more sockets in at the cost to our project (rather than the workshop move budget) can a normal sparky do that or do you need a specialist ? and what sort of cost are we looking at (this is just wire in conduits on blockwork so no plastering or making good involved.
cheers in advance
P