Paul.J
Established Member
Before putting the final coats of varnish on the stand,i thought it best to drill all the holes required for the swing iron brackets.
Here is one of the steel bearing plates fitted.
These go under the swing irons and save the timber been worn away.
This is one of the brass swing irons brackets.
These are bolted down to the top rail.Drilled with a 6mm bit.
There will be a smear of grease applied here when it is finally assembled.
Here is what it will look like assembled.
click on images
Just gotta varnish and wait for it to dry :roll:
So while this is happening i can put all the tak onto the horse
Here is one of the steel bearing plates fitted.
These go under the swing irons and save the timber been worn away.
This is one of the brass swing irons brackets.
These are bolted down to the top rail.Drilled with a 6mm bit.
There will be a smear of grease applied here when it is finally assembled.
Here is what it will look like assembled.
click on images
Just gotta varnish and wait for it to dry :roll:
So while this is happening i can put all the tak onto the horse