Bench for a slight upgrade of lathe. And to make it the right height for me. Jobs always take longer than you think. All timber I’ve been keeping because “that will get used for something”.
View attachment 191790
Good bits of damaged construction timber.
View attachment 191794
Legs Douglas Fir left over from a pergola.
View attachment 191795
Splay 5 degrees sideways and fore and aft. Front rail a bit of Oak that came from a recycle yard, Rubberwood shelves from discarded furniture and scrap metal collection for added weight!
View attachment 191796
Arghh! Disaster! The base packers meant the bolts were too short, so had to part with a fiver for a length of threaded bar and some nuts. Had all the coach bolts in stock.
View attachment 191797
Well it works, but clearly needs doors! Has taken 8 days.