Nearly finished......

After finishing the tiling, I left the job so the customer could do some decorating. Not sure why it took so long as there was only a ceiling and a bit of woodwork to do :?

I got all the doors finished and installed this week. I had delayed actually putting the doors together until closer to the time of installation as I didn't really have anywhere to store them and wanted to avoid any damage. Also got the trim installed. NOTE - the doors haven't been levelled yet.

DSC00088-4.jpg


DSC00089-1.jpg


DSC00090-1.jpg


DSC00091-1.jpg


DSC00092.jpg


Detail of the m&t joint used in all the doors and drawers

DSC00095-1.jpg


The joints weren't spot on off the saw, so I spent quite a bit of time having to fettle each joint. This probably took me about an extra day (33 doors/drawers, 4 m&t's per component). It was worth it in the end, as the joints were a nice fit.

Finally, a little close up of the door detail.

DSC00098.jpg


I've got 1 more day to finish off (i've been waiting for the toughened glass for the two doors either side of the extractor - the glass supplier tried to fob me off with non-toughened). I'll post the final pics later in the week.

Thanks for looking.