I'm about to undertake a job for a friend in 2weeks time, to lay 90sqm of 18mm solid oak.
One thing has always puzzled me though..........
If you have to allow for expansion and contraction, how is this affected by porta nailing it to the substrate :shock:
3/4s of the floor is floorboards, the rest ( a new extension ) is concrete, with this in mind, what would you suggest the best way to go about the prep, and any details of sticky stuff for the concrete?
Much appreciated
Jed
One thing has always puzzled me though..........
If you have to allow for expansion and contraction, how is this affected by porta nailing it to the substrate :shock:
3/4s of the floor is floorboards, the rest ( a new extension ) is concrete, with this in mind, what would you suggest the best way to go about the prep, and any details of sticky stuff for the concrete?
Much appreciated
Jed