JonnyD
Established Member
A bit of fun for a Friday. A load of larch was delivered and we started with the base. The T&G boards were held temporarily underneath whilst a circle was routed out to 1.75m diameter
The boarding was pre machined but a housing was needed to fit over the base so this was done on the RAS
The boards were placed around the base and pulled in with some large ratchet straps.
Over she goes
You can see the metal straps holding it together here
The heating is done by woodburner which you can see here.
Cheers
Jon
The boarding was pre machined but a housing was needed to fit over the base so this was done on the RAS
The boards were placed around the base and pulled in with some large ratchet straps.
Over she goes
You can see the metal straps holding it together here
The heating is done by woodburner which you can see here.
Cheers
Jon