billw
The Tattooed One
OK so I'm following a design for a router fence, where there are two moveable panels on the front face to allow the adjustment of the gap in the middle. The maker has simply run two bolts through each one from the front but I think this looks untidy.
Could I simply put these in the back to hold the threads?
Insert Nuts Type D M6 x 13mm 50 Pack | Insert Nuts | Screwfix.com
This is roughly what I'm working off, except I'm not using MDF because I'm not weird.
Could I simply put these in the back to hold the threads?
Insert Nuts Type D M6 x 13mm 50 Pack | Insert Nuts | Screwfix.com
This is roughly what I'm working off, except I'm not using MDF because I'm not weird.