So I do a lot or work using MR MDF (I really need to post more of the jobs in the projects section) and I seal the edges with Zinnser Bin (awesome product, if a little expensive). This is very time consuming.
I was thinking of ways to speed up this part of the production.
Would it be quicker for me to use a dedicated edgebander to apply the edging? I've seen the small hot air/melt machines on eBay and other dedicated tool sites for not a lot of money. I also have plenty of room in my workshop to set aside an area to do this adding my own extension beds for longer work.
Would like people thoughts on this as the Zinnser bin takes so long to apply and then remove excess that bleeds over the edges.
Cheers
I was thinking of ways to speed up this part of the production.
Would it be quicker for me to use a dedicated edgebander to apply the edging? I've seen the small hot air/melt machines on eBay and other dedicated tool sites for not a lot of money. I also have plenty of room in my workshop to set aside an area to do this adding my own extension beds for longer work.
Would like people thoughts on this as the Zinnser bin takes so long to apply and then remove excess that bleeds over the edges.
Cheers