Grahamshed
Established Member
I am fed up of dragging the extractor around so I am finally getting round to piping the workshop ( ok, the shed )
At its basic level there will be something like 26 feet of 63mm piping with outlets to 6 machines. I know I will need a blast gate on the outlet to each machine but should I also put one just past each machine to stop the suction having to work any further along the system than it needs to ?
It may help to know that the extractor will be placed off a t joint part way along the system with machines to both sides..... although I could perhaps avoid this if necessary.
At its basic level there will be something like 26 feet of 63mm piping with outlets to 6 machines. I know I will need a blast gate on the outlet to each machine but should I also put one just past each machine to stop the suction having to work any further along the system than it needs to ?
It may help to know that the extractor will be placed off a t joint part way along the system with machines to both sides..... although I could perhaps avoid this if necessary.