kevinlightfoot
Established Member
I mentioned a while back that I was having a new kitchen built and fitted.Idecided on a local company and agreed a price that would be paid in stage payments and that a sum of£1500 would be retained just in case anything should go wrong.From the offset things did go wrong,from design mistakes,poor tradesmen doing the fitting and customer service being very poor,I have had to correct poor work myself,coordinate tradesmen and generally have to put up with unsatisfactory communication over the many problems which have occurred .From poorly fitted cabinets,leaky plumbing,incorrect installation of hob extractor,abysmal fitting of the kitchen units plinths and cabinet doors and drawers to my having to assist from the very start with the removal of the old kitchen because only one chap was sent on his own,assist in the fitting of cabinets because the fitter did not have the required tools or indeed the ability,I am curious as to what the panel think when I am holding back the reminder of the money.The company are saying that if I do this then all of the istallation will not be guaranteed including appliances and granite worktops.What do you think?