So I have finally got started on the workshop. Block built (needs to be non combustable) 7m x just under 5m pitched roof is what I have planning permission for. The long side walls to be built in block with gable end above garage door in timber, gable end garden will also be timber clad stud wall with the cladding extending over the ugly blocks.
In the future may well clad the lot or have it rendered.
I have cleared site and started digging footings but have a couple of decisions to make and would appreciate your advice. learnt alot already from this site but need second opinions on several things.
Yes I know photos are compulsory, I will upload some, don't worry the speed that I work you are not likely to miss anything.
1. Foundations (sketch attached. hopefully) footings and 3 courses of blocks to bring me up to slab level, there is a height difference between mine and neighbours. Structural engineer has advised it is ok to infill with dry fill between two walls but should I line the blocks with some form of damp proofing to keep the worst of the moisture away, ie a basement plastic lining type material?
2. I can of course step down the DPC once I am past the higher part, but is there any problems with keeping the DPC up so high?
3. Slab, I would like to insulate the slab a little (under and around the perimeter) to keep the damp and cold at bay. will 25mm of jablite make much difference? can I use expanded polystyrene below the slab? and what do I do at the garage door end, or just leave the vertical piece of insulation out here and accept the cold bridge?
I shall attempt to attach the sketch, more questions to follow.
Thanks in advance
In the future may well clad the lot or have it rendered.
I have cleared site and started digging footings but have a couple of decisions to make and would appreciate your advice. learnt alot already from this site but need second opinions on several things.
Yes I know photos are compulsory, I will upload some, don't worry the speed that I work you are not likely to miss anything.
1. Foundations (sketch attached. hopefully) footings and 3 courses of blocks to bring me up to slab level, there is a height difference between mine and neighbours. Structural engineer has advised it is ok to infill with dry fill between two walls but should I line the blocks with some form of damp proofing to keep the worst of the moisture away, ie a basement plastic lining type material?
2. I can of course step down the DPC once I am past the higher part, but is there any problems with keeping the DPC up so high?
3. Slab, I would like to insulate the slab a little (under and around the perimeter) to keep the damp and cold at bay. will 25mm of jablite make much difference? can I use expanded polystyrene below the slab? and what do I do at the garage door end, or just leave the vertical piece of insulation out here and accept the cold bridge?
I shall attempt to attach the sketch, more questions to follow.
Thanks in advance