With the winter coming on I thought it was time to put some insulation innthe workshop. Like a lot of people on the forum I use a convetrted garage as the workshop, which has a concrete floor, also the wall that is not attached to the house is only single skin.
I started by laying 2" x2" battens secured with thunder bolts and inlaid with extratherm insulations.
The workshopis 22ft by 12ft, the laying of the whole floor took 6 hours
Now its time to start the walls, I've decided to use the same material.
Hopefully I'll get the walls finished today.
I started by laying 2" x2" battens secured with thunder bolts and inlaid with extratherm insulations.
![Workshop-02.jpg](https://proxy.imagearchive.com/5c9/5c98d6a6e56974e3d58dbd70613cf664.jpg)
The workshopis 22ft by 12ft, the laying of the whole floor took 6 hours
![Workshop-04.jpg](https://proxy.imagearchive.com/9bc/9bc1add76f1fdc77acedc7d0d01cd32d.jpg)
Now its time to start the walls, I've decided to use the same material.
![Workshop-05.jpg](https://proxy.imagearchive.com/029/0297eef1c21ce54b709cc9e675945d26.jpg)
Hopefully I'll get the walls finished today.