Out int shed
Established Member
Hello all.
I hope you like this little project. Its the first one in my new workshed and on my new workbench (see bench build here: https://www.ukworkshop.co.uk/forums/view ... 2&start=15 )
I picked up a nice piece of straight cut steamed beach still with wane. Lots of planing to do by hand!:
and hey presto....
Thats the top started.
Then I measured and cut the meranti into the sections needed for the frame. Sorry, no picks of this bit.
Made a simple jig for making the mortice with a router. These are stopped tenons so only needed to remove a little stock:
Chisel to square off corners. I like to use a mortice chisel with a mallet so as to square off 3 faces at once.
Another simple jig comes out for cutting the tenons.
After all the bits have been cut and cleaned I can dry fit:
Then the frame was glued and checked for square. I couldn't resist fitting the top to see the effect.
Still have the beech top to trim and have a final plane. The frame will need a clean up and panels and shelving fitted.
Not got a spare weekend in May so may be a while to the finish line yet.
I hope you like this little project. Its the first one in my new workshed and on my new workbench (see bench build here: https://www.ukworkshop.co.uk/forums/view ... 2&start=15 )
I picked up a nice piece of straight cut steamed beach still with wane. Lots of planing to do by hand!:
and hey presto....
Thats the top started.
Then I measured and cut the meranti into the sections needed for the frame. Sorry, no picks of this bit.
Made a simple jig for making the mortice with a router. These are stopped tenons so only needed to remove a little stock:
Chisel to square off corners. I like to use a mortice chisel with a mallet so as to square off 3 faces at once.
Another simple jig comes out for cutting the tenons.
After all the bits have been cut and cleaned I can dry fit:
Then the frame was glued and checked for square. I couldn't resist fitting the top to see the effect.
Still have the beech top to trim and have a final plane. The frame will need a clean up and panels and shelving fitted.
Not got a spare weekend in May so may be a while to the finish line yet.