mailee
Established Member
My next job isn't until next week so I thought I would fill in with a long overdue job of a wine rack in AWO. I first cut out the sections I needed and glued an 'L' shape together for the legs/sides.
I cut arches into the top apron pieces. I also cut a double arch into the front apron as there will be a decorative panel in the centre of them.
After glueing up the sides I routed a stopped detail around the edges and had a dry fit by the end of the day.
This will be an in between job so will see what I get done tomorrow. :wink:
I cut arches into the top apron pieces. I also cut a double arch into the front apron as there will be a decorative panel in the centre of them.
After glueing up the sides I routed a stopped detail around the edges and had a dry fit by the end of the day.
This will be an in between job so will see what I get done tomorrow. :wink: