Hi Guys.
I need some Iroko for a table that I am building for a friend. I've had a price for some iroko which is a bit high.
4 number 2.1 meter lengths of 4 x 1 prepared = total 8.4 m
9 number 2.1 meter lengths of 3 x 1 prepared = total 18.9 m
2 number 2.1 meter lengths of 3 xi 3 prepared = total 4.2 hm
The finished sizes will be slightly smaller taking planing into account.
£250.00 + vat = silly money.
I need a better idea of what people expect to pay for iroko. I am going to try some other timber yards on Monday.
I'll start with the company in wycombe. I live in the Uxbridge area.
Cheers Alan
I need some Iroko for a table that I am building for a friend. I've had a price for some iroko which is a bit high.
4 number 2.1 meter lengths of 4 x 1 prepared = total 8.4 m
9 number 2.1 meter lengths of 3 x 1 prepared = total 18.9 m
2 number 2.1 meter lengths of 3 xi 3 prepared = total 4.2 hm
The finished sizes will be slightly smaller taking planing into account.
£250.00 + vat = silly money.
I need a better idea of what people expect to pay for iroko. I am going to try some other timber yards on Monday.
I'll start with the company in wycombe. I live in the Uxbridge area.
Cheers Alan