wizer
Established Member
- Joined
- 3 Mar 2005
- Messages
- 15,589
- Reaction score
- 1
Hi all
Since we decided to move I have saved the 'good' WBP Plywood for the new workshop. It's use is yet undecided, at least it will be used to line one wall. There are, I think, 8 sheets.
Trouble is how to I shift them the 3miles to the new place? They are currently laid flat on my drive under tarpaulin.
I thought about a roofrack on the missus 206. Is that a silly idea?
Since we decided to move I have saved the 'good' WBP Plywood for the new workshop. It's use is yet undecided, at least it will be used to line one wall. There are, I think, 8 sheets.
Trouble is how to I shift them the 3miles to the new place? They are currently laid flat on my drive under tarpaulin.
I thought about a roofrack on the missus 206. Is that a silly idea?