StevieB
Established Member
Now owning a decent planer and thicknesser, I am able to buy sawn timber and prepare it myself. I picked up some sawn oak on saturday and have run it through the planer and thicknesser to rough dimensions. How long do you suggest it is left to aclimatise before going to final dimensions? Does it depend on its location or is it thickness dependant like drying wet boards? Boards were an inch thick and I have taken the minimum off to get a good face on all sides - leaving me at about 20mm thick. Would leaving them a week until next Saturday be OK or does it need longer? Final dimension will be 18mm hopefully.
Cheers,
Steve.
Cheers,
Steve.