Deadeye
Established Member
I have some slabs too wide (and unwieldy) for my planer, so I built a sled for my router (DW624).
However, at fully plunged, the bit is only 16mm below the foot of the router...and the sled is 18mm thick.
So I bought a Trend collet extender (1/2" collet and 1/2" surfacing cutter) - and it's completely unusable - it vibrates fit to burst and wrenches the router around even when not in contact with the wood.
I know the issue isn't the router or the cutter - if I take off the extension, it all runs fine with just the cutter, I just can't use it through the floor of the sled. Similarly, the extension without the cutter runs rough as old boots (slightly less bad because there's slightly less mass but still awful)
Any advice? Is it possible to rebalance these things?
However, at fully plunged, the bit is only 16mm below the foot of the router...and the sled is 18mm thick.
So I bought a Trend collet extender (1/2" collet and 1/2" surfacing cutter) - and it's completely unusable - it vibrates fit to burst and wrenches the router around even when not in contact with the wood.
I know the issue isn't the router or the cutter - if I take off the extension, it all runs fine with just the cutter, I just can't use it through the floor of the sled. Similarly, the extension without the cutter runs rough as old boots (slightly less bad because there's slightly less mass but still awful)
Any advice? Is it possible to rebalance these things?