I am mulling over the position, in the garden, of a new workshop.
I have a plan to head for the top of the garden, 60 metres from the road and up a pretty steep slope with some steps.
Here are some pictures;
View from the road up the path, steps toward the gate and back garden
Through the gate and a view up the back garden access up the grassy slope.
Past the wildlife in these here parts :lol:
A dog left turn at the top of the slope, through some shrubs
To the steps which lead to the potential location, where the existing summer house is found.
Here is a view from the summerhouse over the town and out to sea.
The summer house is going to be moved, the children use this quite a lot and bringing it down to the lower level near the lawn is a good plan.
The area for the workshop will be about 5m2.
I am wondering about moving machinery up to this location, there is no access for lifting gear. What options exist to tackle this issue? Can machines be dismantled and moved in pieces? How big a job is this?
I already have power to this spot and can pump concrete up there for the base.
I need to be sure that I can move machinery to the new workshop, thoughts and comments much appreciated.
Cheers, Tony.
I have a plan to head for the top of the garden, 60 metres from the road and up a pretty steep slope with some steps.
Here are some pictures;
View from the road up the path, steps toward the gate and back garden
Through the gate and a view up the back garden access up the grassy slope.
Past the wildlife in these here parts :lol:
A dog left turn at the top of the slope, through some shrubs
To the steps which lead to the potential location, where the existing summer house is found.
Here is a view from the summerhouse over the town and out to sea.
The summer house is going to be moved, the children use this quite a lot and bringing it down to the lower level near the lawn is a good plan.
The area for the workshop will be about 5m2.
I am wondering about moving machinery up to this location, there is no access for lifting gear. What options exist to tackle this issue? Can machines be dismantled and moved in pieces? How big a job is this?
I already have power to this spot and can pump concrete up there for the base.
I need to be sure that I can move machinery to the new workshop, thoughts and comments much appreciated.
Cheers, Tony.