stuartpaul
Established Member
Soon to start turning the double garage into my new workshop. The roof is a double hip and when the ceiling is plaster-boarded installing the insulation is going to be a right pain the the dooh-dah!
I'm therefore thinking how I can do it before boarding. I've already got a load of earthwool left over from another job so prefer to use that rather than go out and buy extratherm (or similar) which I know would make for an easier job.
Any tricks of the trade for holding mineral wool insulation in place prior to boarding?
Thanks in advance.
I'm therefore thinking how I can do it before boarding. I've already got a load of earthwool left over from another job so prefer to use that rather than go out and buy extratherm (or similar) which I know would make for an easier job.
Any tricks of the trade for holding mineral wool insulation in place prior to boarding?
Thanks in advance.