Good evening All,
I recently obtained an old Union Graduate that I am refurbishing. I have purchased a 1.5Hp 3 phase motor and inverter package from Newton Tesla. I have the lathe stripped out and am preparing it for painting. Whilst I am doing this I wanted to send the motor plate away for re-drilling the mounting threads, however I do not have any measurements for where they need to be. Has anyone fitted this package before and can give me the required measurements?
Thanks
Brian
I recently obtained an old Union Graduate that I am refurbishing. I have purchased a 1.5Hp 3 phase motor and inverter package from Newton Tesla. I have the lathe stripped out and am preparing it for painting. Whilst I am doing this I wanted to send the motor plate away for re-drilling the mounting threads, however I do not have any measurements for where they need to be. Has anyone fitted this package before and can give me the required measurements?
Thanks
Brian