Planning to put a 1500kw extractor outside and bring the 100mm pipe into the workshop.
This will be connected to smaller machines - mitre saw, bandsaw etc.
Do i immediately step down to (say 50mm etc) or run with the 100mm pipe right up to each unit before reducing ?
Thanks.
This will be connected to smaller machines - mitre saw, bandsaw etc.
Do i immediately step down to (say 50mm etc) or run with the 100mm pipe right up to each unit before reducing ?