A 1 in 4 mix (cement/ ballast) with a 0.5 water to cement ration will give 40N/mm2 cube strength concrete. That should be adequate if you will be moving the stones at anytime or putting a bench on top.I know I'm resurrecting a two year old thread, but wondering how your staddle stones turned out. I just made a truncated pyramid mould, and I'm planning on casting a couple this weekend. Any tips re. concrete mix or anything else gratefully received.
Cement will keep for a few years if you keep the air and hence water from it. Wrapped it up in a couple heavy duty bin bags. If it is well wrapped it will keep for a couple of years If you buy 40N prebagged concrete it is likely to have a small amount of moisture inside the aggregate so will not keep as long.
If you put polythene inside the mould it is likely that there will be wrinkles formed in the concrete.
Spray the inside of the shutter with mould oil. You could use cheap vegetable oil but I do not know how it would effect the finish, you could do a test.
If it is going to be below 3C at night make sure you wrap it up to keep the concrete from freezing. Do not mix if it is below 3C.
I would not move the concrete for at least three days after casting or you are likely to knock the corners off. But do release the shutter as much as possible the next day. Keep the concrete damp for the first few days.
40N/mm2 concrete will be up to about 30N after seven days