A
Anonymous
Guest
Right. Just a different view of waste. I'd see your example as giving two 3" boards for the job in hand, and one 4" board as stock. No waste at all so far!orangetlh":6ozfto45 said:snip
If you take one board 10" wide and you want two 3" boards, youve lost nearly 30% already not taking into account saw cuts and machining.
snip
For me it's only waste when it's un-useable, or unlikely ever to be used.
When I'm ordering for a job I also add usually about 10% but also tell the woodyard to round it up to the next length and not to cut anything. So a requirement for say 12M might arrive as 4no x 3.9M which gives me some extra stock. So I'm really ordering for stock, but with a view to how much I will need for the next job or jobs.
cheers
Jacob