vibraphone
Member
Hi
I regularly have to through mortise 105mm softwood planks which I currently do with my side mortiser. The problem is it only goes to 75mm so I need to flip the workpiece and go from the other side to finish. When I have 150 of them to do it eats up the time and I'm looking to speed things up.
I'm looking at the possibility of a hollow chisel mortiser but I'm not overly familiar with them and am not sure on the availability of 100mm+ chisels. I would appreciate any advice as this is a repeat job and I'm starting to go round the bend. Thanks
I regularly have to through mortise 105mm softwood planks which I currently do with my side mortiser. The problem is it only goes to 75mm so I need to flip the workpiece and go from the other side to finish. When I have 150 of them to do it eats up the time and I'm looking to speed things up.
I'm looking at the possibility of a hollow chisel mortiser but I'm not overly familiar with them and am not sure on the availability of 100mm+ chisels. I would appreciate any advice as this is a repeat job and I'm starting to go round the bend. Thanks