  1. D

    Proposed workshop build

    I'm drawing up my plans for studwork, I notice some peoples builds are spacing their studs at 610 centres for the internal 11mm osb cladding, is this not a bit far leaving the osb unsupported over 610mm? Limits fixing points for shelving too.
  2. D

    Proposed workshop build

    My brick plinth is nearly completed I just need to decide on door opening size, current thinking is a pair of 3' doors which I will make. Bit of opinion and advice needed here though, do I mount my frames directly onto the plinth with dpc or mount a soleplate first? Secondly should I add a...
  3. D

    Proposed workshop build

    As it's on a concrete pad 50mm above ground surely I can use a more decorative brick then?
  4. D

    Proposed workshop build

    How critical are engineering bricks in this situation?
  5. D

    Proposed workshop build

    Will lime be as strong and water repellent
  6. D

    Proposed workshop build

    Thanks Paul, presumably bed dpc onto fresh mortar then soleplate onto dpc and fasten down to brickwork getting it level? It's been mentioned to me that a single skin of brick is undersized but it seems to be the way MikeG designed his raft workshop with no issues, as I'll be lining it in osb...
  7. D

    Proposed workshop build

    My pad is now down and looking good, next job is the brick plinth. I'm open to suggestions but I'd like a lime coloured mortar and aged looking red bricks, should I be using engineering bricks for this or am I OK to use standard bricks? I'm intending three courses one brick thick and a sole...
  8. D

    Proposed workshop build

    It's being pumped Dave, I've read about different grades and now have no idea which I should use
  9. D

    Proposed workshop build

    Thanks Paul, c25 then? The problem with c25 and c35 is they say its not suited to power floating, is that the same as using a vibrating screeder?
  10. D

    Proposed workshop build

    The company delivering my concrete have suggested Gen3 for my raft, is this suitable considering at least 50mm will be left exposed. I've read that it's not suited to being left to the elements, any opinions or advice welcome.
  11. D

    Proposed workshop build

    For now it's 7.2m to stay within the permitted development of 30m² internal floor area....well nearly
  12. D

    Proposed workshop build

    Well I got my pad dug out with a fair amount of help from my nephew who does landscaping. Just waiting for some time to go and pick up some boarding to make my form work with before getting a load of type 1 to whacker plate down. I'll book the concrete ready for a few weeks time when I know...
  13. D

    Proposed workshop build

    I've got a mini digger booked for Saturday but I'm having second thoughts on my area of 7.2 x 4.8m (just a shade over 30m² internal area) it looks quite square but that works well with sheet sizes. I'd go 8.4 long but without planning that's pushing it I think.
  14. D

    Proposed workshop build

    I intend a raft so no foundations for blocks
  15. D

    Proposed workshop build

    I have been lead to believe that fibre reinforced isn't for slab strength but surface strength, I aim to set my mesh towards the bottom of my raft. I also thought the MOT around the raft helped with drainage and aopporting the slab
  16. D

    Proposed workshop build

    As the weather is looking good I intend hiring a mini digger next weekend to dig out for my type 1 mot sub base, I have a few questions however. As the ground is pretty solid clay I thought 100mm mot, blinding sand, membrane followed by 100-120mm concrete pad (7.2 x 4.8m) my main query is...
  17. D

    Proposed workshop build

    Would thompsons water seal work?
  18. D

    Proposed workshop build

    Thanks Fitz, that's exactly the issue. I'll take a look at the link as I want the raft to be my finished floor with 3 courses of brick then my studwork
  19. D

    Proposed workshop build

    I'm getting close to the point of starting this now but still don't see how the dp membrane has continuity after the raft shuttering is removed, there will be a gap between it and where my 3 courses of engineering bricks end. Am I at risk of driving rain finding a way between the raft and brick...
  20. D

    Proposed workshop build

    I love my 675 but don't ride it enough, I also have an xs650b that I'm lightly restoring, it smells so good.