Finally been able to sort out the space in the workshop after getting rid of a couple of motorbikes and a hydraulic ramp.
Construction is a basic concrete sectional double garage which has been insulated and lined. The floor is concrete with interlocking plastic tiles. Burglar and fire alarm are fitted. It stays really warm in the winter and keeps cool in the summer with 50mm Sellotex insulation throughout.
Wall units are standard kitchen units and the floor units are purchased via the bay of e. Lighting is part fluorescent tubes and accent lighting using strip LED. Electrical feed is independent and on a trip, double plug sockets are placed every 900mm around the perimeter and within ducting. Theres still a few units to make to fill spaces for storage... it never is quite finished is it!
This is a trial layout to see how it works... may have to shift things about a bit depending what is being made but it is quite an adaptable layout.
The space under the window is where a metal lathe is going to live.
Construction is a basic concrete sectional double garage which has been insulated and lined. The floor is concrete with interlocking plastic tiles. Burglar and fire alarm are fitted. It stays really warm in the winter and keeps cool in the summer with 50mm Sellotex insulation throughout.
Wall units are standard kitchen units and the floor units are purchased via the bay of e. Lighting is part fluorescent tubes and accent lighting using strip LED. Electrical feed is independent and on a trip, double plug sockets are placed every 900mm around the perimeter and within ducting. Theres still a few units to make to fill spaces for storage... it never is quite finished is it!
This is a trial layout to see how it works... may have to shift things about a bit depending what is being made but it is quite an adaptable layout.
The space under the window is where a metal lathe is going to live.