Rob H
Established Member
I have been on with it now for the last 6 months on and off the so called summer did not help matters. but its getting there now. i spent 2 weeks just clearing the space for it. its 18ft+14tf onto the side of the existing 18ft+8ft workshop.
heres some picks so far
making the roof trusses 2 days of cutting and welding
shuttering and concreating to level up the floor
finished roof truss ready for up!!
first 1 up
welding its a lot faster than joining wood!!
heres some picks so far
making the roof trusses 2 days of cutting and welding
shuttering and concreating to level up the floor
finished roof truss ready for up!!
first 1 up
welding its a lot faster than joining wood!!