So last Saturday my new bigger workshop was built and since then I've been getting concerned about the damp inside.
The building was delivered the Monday before and as soon as it was it chucked it down but the days after the delivery were dry. However when we came to erect it the panels were still really quite damp.
One week on (almost) and the inside is still really damp and it seems that patches of the walls are really wet in places after a good downpour.
I want to move into my new workshop soon and dismantle the old one but I don't really want to work in a place with damp walls.
Any suggestions on what I can do to rectify this problem?
The building was delivered the Monday before and as soon as it was it chucked it down but the days after the delivery were dry. However when we came to erect it the panels were still really quite damp.
One week on (almost) and the inside is still really damp and it seems that patches of the walls are really wet in places after a good downpour.
I want to move into my new workshop soon and dismantle the old one but I don't really want to work in a place with damp walls.
Any suggestions on what I can do to rectify this problem?