We had a loft conversion done 2 years ago.
The builder turned out to be totally unreliable (polite way to say it) - so I wouldn't go back to him even if I could.
I don't know if its normal for this to happen - but the door to the little bathroom no longer closes. Its too 'tight'.
I tried sanding down the edge a little (along the inside edge the door - around the handle/lock.)
But soon realized that the whole thing needs planing back - I think.
Now - because there is a latch set into the door - I'm thinking I need to take it off and plane (sand) down the other side a few mm (where the hinges are attached) and then set/chisel out the hinges again to make them fit.
But I'm wondering if there might be a better/easier way.
Attaching some pix below.
Thanks in advance for any advice.
(apart from get a better builder)
Cheers
The builder turned out to be totally unreliable (polite way to say it) - so I wouldn't go back to him even if I could.
I don't know if its normal for this to happen - but the door to the little bathroom no longer closes. Its too 'tight'.
I tried sanding down the edge a little (along the inside edge the door - around the handle/lock.)
But soon realized that the whole thing needs planing back - I think.
Now - because there is a latch set into the door - I'm thinking I need to take it off and plane (sand) down the other side a few mm (where the hinges are attached) and then set/chisel out the hinges again to make them fit.
But I'm wondering if there might be a better/easier way.
Attaching some pix below.
Thanks in advance for any advice.
(apart from get a better builder)
Cheers