This morning started beautifully, so Ithought great, we'll be moving plasterboard in the dry. Except that it didnt arrive until 1 by which time it was raining.
They've delivered pink fire graded board because it was all they had in that size.
So this morning we did more boarding ....
[ATTACH=full]31016[/ATTACH]
I discovered I have a very wonky stud. The panel edge is vertical...
[ATTACH=full]31017[/ATTACH]
and this afternoon we carried 18 sheets down. My mate Stuart has lent me a trolley, to which we have screwed a couple of battens but although it was easier on the back I think Ray thought it was more trouble than it was worth.
[ATTACH=full]31018[/ATTACH]
[ATTACH=full]31019[/ATTACH]
[ATTACH=full]31020[/ATTACH]
Now I need to buy a panel lifter.