Hi All,
Im currently building in the garden (digging foundations at the moment) and I have a concern about my lintle. My ridge beam for the apex roof sits in the middle of another beam which spans a double doorway. My concern is that the wooden beam will bend under load and crack the door. So im concidering an i-beam. Any help on replacing the beam over the door with an i-beam would be great
Specs
Base
Im currently building in the garden (digging foundations at the moment) and I have a concern about my lintle. My ridge beam for the apex roof sits in the middle of another beam which spans a double doorway. My concern is that the wooden beam will bend under load and crack the door. So im concidering an i-beam. Any help on replacing the beam over the door with an i-beam would be great
Specs
Base
- Footprint
- 5011mm deep x 4610mm wide
- Ground screws
- 1200mm round flange ground screws from thegroundscrewshop.co.uk
- 100mm L profile fixing bracket
- Beams
- 145mm x 70mm
- doubled up around edges
- 400mm on centres
- Rafters
- 145mm x 45mm
- 600mm on centres
- Simpson SAE250/47 H/Duty Face Fix Hanger 47mm
- DPM
- 1200 gauge DPM on underside of timber
- Insulation
- 140mm PIR insulation board (0.022 W/mK)
- OSB
- 18mm T&G OSB3 (595mm x 2440mm)
- Beams
- 145mm x 45mm
- 3 bolted together, mainly to match the thickness of a stud
- Studs
- 120mm x 45mm
- Attached with 3.1mm x 90mm Hot Dipped Galvanised Collated nails
- Top / Bottom pates
- Single bottom plate
- Double top plate
- Insulation
- 120mm PIR insulation board (0.022 W/mK)
- OSB
- 11mm OSB3 exterior
- Breather membrane
- Tyvek Housewrap Breather Membrane on top of OSB
- Battens
- Treated battens 500mm on centres
- Firstly vertical to create an air gap then horizontal to attach vertical cladding
- Cladding
- 20mm x 120mm Siberian larch T&G cladding
- C2 stainless steel 4mm x 45mm cladding screws
- Beams
- Two 145mm x 45mm timbers bolted together with coach bolts
- Rafters
- 145mm x 45mm at 4 degrees
- 400mm on centres
- Simpson Strong-Tie RR47 Ridge Rafter
- Birds mouth joint on wall top plate flush finish
- Outriggers
- 95mm x 45mm
- Insulation
- 100mm PIR insulation board (0.022 W/mK)
- Placed on the lower side of the rafters to create a 50mm air gap above
- Breather membrane
- Tyvek Housewrap Breather Membrane below the OSB
- OSB
- 18mm OSB3 exterior
- Roof covering
- TBC